Civil engineering design for infill developments in Hamilton, Halton, and Niagara.

Your return on investment depends on a simple formula:

Return on Investment = Profit / Time


We want to maximize profit in minimal time.
Just follow the math: if time = 0, profit goes to infinity!

This package could save you $100,000—see how it works below.

This package includes:

  • We will complete a site grading plan (design drawing) that meets the local engineering standards.

    Using our expertise we will determine the most cost effective way to grade the development.

    Updates to the design per the reviewers comments are included in the package.

  • We will complete a site servicing plan (design drawing) that meets the local engineering standards. Using our expertise we will determine the most cost effective way to service the development.

    Updates to the design per the reviewers comments are included in the package.

  • We are experts at solving complex stormwater management challenges.

    We’ve developed a series of design options that we use to minimize the cost and complexity of construction, while meeting the City engineering standards.

  • We will prepare an erosion and sediment control plan to meet the local engineering standards.

    We will design a plan that provides protection while minimizing the material and installation costs.

  • We will prepare a functional servicing report to detail the developments impact on the municipal water and sanitary sewer systems.

    The report is submitted to the City or Region to confirm that they have spare capacity in their network to service the development.

  • We will prepare a stormwater management report detailing how the site achieves or exceeds the desired stormwater control.

    The report is submitted to the City / Town engineering staff for their review.

Plus bonus items:

  • For each development we prepare a fully itemized and detailed cost estimate.

    We review the estimate in detail and modify the design and selected components to minimize the construction cost. For example, we often replace expensive catch basins with more economical trench drains. The trench drains are easier to install and have simple maintenance.

    With this estimate in hand you can approach your development with more confidence.

  • We move fast—8-day turnaround on all deliverables, guaranteed!

    See the guarantee section for more information on our commitment to results and excellent service.

20% - 40%

Typical budget spent on civil construction

You spend 20-40% of your budget building the roads and sewers. Your engineer’s decisions control hundreds of thousands to millions of dollars in construction costs.

This can make or break your return.  

You need a product built for your bottom line—with a guarantee that backs it up.

See below to learn how our package offers an estimated $100K in savings, and our guarantee that we’ll deliver.

Learn how this product can save you an estimated $100,000 on your next development:

  • We move fast—8-day turnaround on all deliverables, guaranteed!

    Estimated $12,000 in savings based on 2 months of time saved at $6k/month carry cost)

    • Our hyper-detailed plans include everything your team needs—extra views, detailed assemblies, and full specs—for faster builds and fewer questions.

    • We optimize design elements to save you money without cutting corners.

    • We tackle delays and extra costs before they happen through early City coordination, invert checks, thorough site time, etc.

    Estimated $44,000 in savings based on reduced contractor bid due to minimized requirements and clarity of plans.

    • Get a fully itemized construction cost estimate so you know exactly what you’re paying for.

    • We help you build smarter with product and material choices that lower costs and boost returns.

    Estimated $32,000 in savings from optimized product and materials selections.

    • From first sketch to final stamp, we handle it all. No hidden fees. No extras.*

    • We include meetings with municipal engineers to smooth out approvals and speed up progress.

    *See our short list of exclusions below.

    Estimated $12,000 in savings from 3 extras eliminated at $4k each.

  • $100,000!

Estimated savings based on a $4 - $6 million project budget.

Guarantee

Great partnership’s involve shared risk.

We’ll stake 51% of our fee on our work.

See how below:

  • 8-day turnaround on all deliverables, guaranteed!

    We’ll return $2,000 per missed timeline.

  • We guarantee that our plans are accurate and detailed.

    We’ll return $3,000 per change order.

    Note the change order must originate from an error or omission in our plans.

We’re limiting this offer to just 3 developments per month.

Connect with us to secure your spot.