Pool Permits in Oakville: What You Need to Know About Grading, Drainage and Stormwater
Oakville, Stormwater, Engineering, Civil Wesley Taylor | P.Eng Oakville, Stormwater, Engineering, Civil Wesley Taylor | P.Eng

Pool Permits in Oakville: What You Need to Know About Grading, Drainage and Stormwater

Most Oakville pools need a Development Engineering Permit, because the Town treats pool installation as changing the grading of a lot. Applications need a detailed grading plan, tree protection documents, a stormwater form, fees, securities and a compliant pool fence. The grading plan must show that runoff stays on the lot and drains to the street in front, and pool water must be pumped to the street too. If runoff flows toward neighbours, or the lot has too many hard surfaces, the Town requires a stormwater management design. Everwest Engineering designs grading and stormwater systems with the lowest reasonable construction cost that the Town approves the first time.

Read More