Pool Permits in Oakville: What You Need to Know About Grading, Drainage and Stormwater
Most Oakville pools need a Development Engineering Permit, because the Town treats pool installation as changing the grading of a lot. Applications need a detailed grading plan, tree protection documents, a stormwater form, fees, securities and a compliant pool fence. The grading plan must show that runoff stays on the lot and drains to the street in front, and pool water must be pumped to the street too. If runoff flows toward neighbours, or the lot has too many hard surfaces, the Town requires a stormwater management design. Everwest Engineering designs grading and stormwater systems with the lowest reasonable construction cost that the Town approves the first time.
Case Study: Saving $2.3 Million on a Medical Office Development
Everwest Engineering saved the developer of a flat-site medical office building and parking garage $2.3 million by switching to gravity drainage instead of a $2 million pump station, and by working with municipal staff to remove the need for on-site infiltration and underground storage.
Stop Overpaying for Under-Engineering: A Client's Guide to Cost-Smart Design
Cost-conscious civil engineering: how smart grading, servicing & stormwater design decisions cut construction costs without sacrificing quality or code compliance—see how one sewer layout choice saved $7,500.
Lot Severances: Unlocking Value and Housing Supply Through Smart Infill Development
In this article we review the benefits and drawbacks of lot severances. The information provided focuses on severances within Hamilton, Halton, and Niagara, including Oakville, Burlington, St. Catharines, Port Colborne, For Erie. and Niagara Falls. Information on the engineering challenges is included such as grading, servicing, and stormwater management.